Noctam/DWP/ACS Test Harness/Meetings/02-Current System

From The Dreaming
Revision as of 10:36, 6 October 2021 by Stuart (talk | contribs) (Saved too early last time. Added a bit more blurb and image placeholders.)
Jump to navigation Jump to search
ACS Test Harness

Meetings

Existing System

Specifications

Diary
2009:

Notes

Friday 1st October 2021

I got together with Mark Henkelis to discuss the current system(s) and how everything hangs together.

He took me through all the stuff he was aware of and the various programs / formats / etc. There are also a bunch of user guides that he put together, which I've received but not yet gone into in any depth.

Some photos from the whiteboard, for what that might be worth - there was mostly animated line drawings going between boxes which probably don't elucidate as much after the fact:


Meeting 01 - Image 01 Meeting 01 - Image 02 Meeting 01 - Image 03 Meeting 01 - Image 04 Meeting 01 - Image 05